Sleepyhead Christchurch
A design and build project to this 11,500 sq m warehouse and manufacturing facility in Hornby Christchurch. This design, supply, installation and commissioning package was provided complete with new fire water supplies, diesel driven split case fire pumps, an automatic infill fire water tank, 2 x sprinkler valve sets, fire sprinkler protection throughout, addressable fire alarm system and fire extinguishers.
A pre-manufactured ESFR sprinkler protection being provided to the warehouse to exacting dimensional requirements due to the steel supporting structure with conventional sprinklers and draft curtains provided to the manufacturing areas. All designed and manufactured in our Glenfield factory and shipped to site in sequenced bundles for easy of installation.
Contract Value $ 700,000 Completed November 2013